Cloud migration services should answer a simple question: which workloads move, in what order, at what cost and with what way back if something goes wrong. We move workloads to AWS, Azure or Google Cloud with a plan built around dependencies, cost and risk, not around a target date chosen in advance.
A migration is rarely a single project. It is a sequence of small, reversible moves, each of which leaves the business running. Our job is to make that sequence explicit, so your finance, security and operations teams know what happens in each wave and what it costs.
Signs you are ready to migrate
Teams usually come to us after one of these events rather than after a strategy workshop.
- A data center exit, colocation contract or hardware refresh forces a decision within a fixed window.
- An operating system or database version is reaching end of support and the current hosting cannot take the upgrade.
- Capacity planning has become guesswork, with peaks causing outages and the rest of the year running at low utilization.
- Disaster recovery exists on paper but has not been tested end to end.
- A previous migration attempt stalled after the easy servers moved.
If you want a quick view of your starting point, try the Cloud Readiness Assessment first.
What the engagement covers
Discovery and dependency mapping
We inventory servers, databases, integrations, batch jobs and licensing, then trace which systems talk to which. Dependencies are the usual reason a wave fails, so this step decides how workloads are grouped. We also record owners, data classification and maintenance windows for every application.
Lift, re-platform and refactor waves
Each workload gets a strategy: rehost as is, replatform to a managed service, refactor for cloud-native design, replace with software as a service, retain or retire. The choice is made per workload, on cost, risk and the effort your team can absorb.
Cutover and rollback runbooks
Every wave has a written runbook: pre-checks, data replication, cutover steps, validation tests, a go or no-go decision and a rollback path. We rehearse cutovers in a non-production environment, and we do not start a wave we cannot reverse inside the agreed downtime window.
Post-migration cost optimization
After workloads stabilize, we rightsize instances, remove idle resources, apply reserved capacity or savings plans and set budgets with alerts. Cost reporting by application owner keeps the savings from eroding.
Choosing a strategy per workload
No single approach suits an entire portfolio. We score each application on business criticality, technical condition, change frequency and the cost of staying put, then assign one of the options below.
| Approach | Best suited to | Trade-off |
|---|---|---|
| Rehost | Stable systems with a hard deadline | Fast, but carries existing inefficiency into the cloud |
| Replatform | Databases, middleware, file services | Moderate effort, lower operations burden |
| Refactor | Systems that change often or must scale sharply | Highest effort, highest long-term benefit |
| Replace | Commodity functions such as email or HR | Needs process change and user adoption |
| Retain or retire | Low-value or tightly coupled systems | Needs a decision on what happens to the data |
Planning around downtime
Downtime is a budget, not a surprise. We agree the acceptable window with each application owner, then choose a technique to fit it: offline copy for tolerant systems, continuous replication with a short final sync for most, and blue-green or phased traffic shifting where the window is close to zero. Cutovers are scheduled around your business calendar, including month-end, trading hours and seasonal peaks.
Handling data at scale
Large datasets drive the schedule more than compute does. We size network links early, decide whether bulk transfer appliances or dedicated connectivity are justified, and validate the data after transfer with row counts and checksums rather than assuming the copy was clean.
How we deliver it
| Phase | What happens | What you get |
|---|---|---|
| Discovery | Inventory, dependency mapping, licensing and data review | Application catalog and risk ranking |
| Strategy and plan | Per-workload approach, wave design, cost model | Migration plan with sequence, cost and rollback points |
| Landing zone | Accounts, network, identity, logging, guardrails | A governed target environment |
| Pilot wave | One low-risk workload moved and validated | A tested pattern and runbook template |
| Production waves | Replication, cutover, validation, hypercare | Workloads live, with evidence of rollback readiness |
| Optimization | Rightsizing, commitments, tagging, handover | Cost reporting and an operating model your team owns |
The plan and the first wave are agreed before the larger program is committed, so you see the pattern working before you scale it.
Platforms and tooling
We work across AWS, Azure and Google Cloud, using each provider's migration services where they help, such as AWS Application Migration Service, Azure Migrate and Google Cloud Migrate to Virtual Machines. For databases we use native replication or provider database migration services. Landing zones are defined as code, commonly with Terraform, so environments can be reviewed and reproduced.
We recommend what fits your estate. Existing Microsoft licensing may favor Azure, an analytics-heavy portfolio may lean toward another provider, and some workloads should stay where they are. If you are still weighing providers or considering more than one, our multi-cloud strategy work covers that decision.
Security and compliance during migration
A migration moves data, and data has rules. We classify data before it moves and confirm where it may be stored, processed and backed up. Depending on your sector, that may involve the DPDP Act 2023, GDPR, HIPAA, PCI DSS or RBI guidelines on outsourcing and data localization.
Encryption in transit and at rest, key ownership, access during cutover and log retention are agreed up front. Once workloads land, the controls described under cloud security and compliance apply from the first day, not after hypercare ends.
Hypercare and handover
The first weeks after cutover are when hidden problems appear: a job that runs only at quarter end, a firewall rule nobody documented, a report that depends on a retired server. We stay close to each wave during a defined hypercare period, watch performance and errors against the pre-migration baseline, and log every issue with its fix.
Handover is a deliverable, not a courtesy. You receive architecture diagrams, runbooks, a cost model, monitoring dashboards and a short training session for the people who will operate the platform. Where you prefer not to run it yourselves, a managed services arrangement can cover monitoring and optimization, but the knowledge should still sit in your documentation.
Industry examples
- Banking and financial services: core-adjacent systems such as reporting, channels and document management often move before the system of record, with strict audit trails and residency checks. See banking and financial services.
- Healthcare: patient-facing portals and analytics workloads can migrate earlier than clinical systems that need extended validation. See healthcare and life sciences.
- Retail: seasonal peaks make elastic capacity attractive, but cutovers need to avoid trading windows. See retail and consumer goods.
Common pitfalls
- Underestimating dependencies. A forgotten batch job or hard-coded IP address can break a wave. Discovery tools plus interviews with application owners catch most of these.
- Moving data last-minute. Large databases need continuous replication started weeks ahead, not a weekend copy.
- Ignoring licensing. Some enterprise licenses change in cost or terms on cloud hosts. We review them in the plan stage.
- Paying twice for too long. Running old and new environments in parallel costs money. The plan sets a decommission date for each source system.
- No owner after go-live. We assign operational owners and train them during hypercare, so support does not default to the project team.
Measuring success
Define the measures before wave one and review them at each wave boundary.
- Cutover duration against the agreed downtime window.
- Number of rollbacks invoked and the cause of each.
- Run cost per application compared with the baseline in the plan.
- Percentage of resources tagged and covered by budgets.
- Recovery time measured in a real failover test.
- Source systems decommissioned versus scheduled.
The ROI calculator is a useful companion when you are building the business case for the plan.
Related services and next steps
Migration is one part of the wider cloud practice. After workloads land, many teams continue with cloud-native development to modernize the applications that benefit most, or with legacy modernization for systems that cannot simply be rehosted.
To scope a migration, book a call with a cloud architect, or send your requirements through request a proposal.